GENIFAB was mandated by the company HMI Construction to carry out the design, workshop drawings and installation drawings related to the gate winches and the stoplogs monorail winch of the spillway.

GENIFAB’S RESPONSIBILITIES

  • Design and shop drawings of new gate winches;
  • Design and shop drawings of new monorail winch for stoplog;
  • Installation drawings
01

Project name

Wuskwatim dam, spillway refurbishment

03

Client

HMI Construction Inc.

02

Location

Burntwood River, MB

04

Year

2007-2009