GENIFAB was mandated by the company HMI Construction to carry out the design and the site and workshop drawings of the winches of the gates and of the monorail winch of the stoplog of the spillway.

  • New gate winches;
  • New monorail winch for stoplog;
  • Design and shop drawings.
  • Cable winch with gears;
  • Superstructure made by others.
  • Total project cost of $16M
01

Project name

Wuskwatim dam spillway

03

Client

HMI Constructions Inc.

02

Location

Burntwood River, MB

04

Year

2007-2009