GENIFAB was mandated by the company HMI Construction to carry out the design, workshop drawings and installation drawings related to the gate winches and the stoplogs monorail winch of the spillway.
GENIFAB’S RESPONSIBILITIES
- Design and shop drawings of new gate winches;
- Design and shop drawings of new monorail winch for stoplog;
- Installation drawings
Project name
Wuskwatim dam, spillway refurbishment
Client
HMI Construction Inc.
Location
Burntwood River, MB
Year
2007-2009